Re: Smulders Projects at Wallsend

PostPosted: Mon Aug 07, 2017 7:52 am
by Whickham
The barges are multiplying and doing a maritime version of the three card trick
On the 06/08/2017 UR 96 was alongside at A&P and ready to go to sea (see later)
UR 98 was alongside Smulders with two more wind farm foundations loaded.
UR 97 had moved up from Howdon and was alongside at Smulders and
UR 902 was waiting down at Howdon.

UR 98.jpg
UR 98 loaded

UR 98-2.jpg
UR 98 loaded

UR 97.jpg
UR 97 waiting to load

Re: Smulders Projects at Wallsend

PostPosted: Mon Aug 07, 2017 8:01 am
by Whickham
The first two of the Smulders wind farm foundations sailed from A&P 06/08/2017

Long range photo from the north side showing the barge and assembled tugs ready to go, but then it came on to rain so I left.

UR 96.jpg

Fortunately Kevin Blair stayed on and captured these a couple of hours later from the south bank.

UR 96-3.jpg
Photo by Keven Blair

UR 96-2.jpg
Photo by Keven Blair

Lead tug CENTAURUS and tail end charlies FORTH & SVITZER TYNE

See photos of CENTAURUS on her own at: viewtopic.php?f=11&t=22827&p=49902#p49902

Re: Smulders Projects at Wallsend

PostPosted: Mon Aug 07, 2017 4:50 pm
by northeast
Good to see Kevin's out and about, he doesn't mind the rain you know ;)

Re: Smulders Projects at Wallsend

PostPosted: Sat Aug 12, 2017 9:02 am
by Whickham
Following on from Richard's post, the four legged structures are for the Beatrice offshore wind farm, which is in the Moray Firth.
Smulders are reported to have 28 of these, so that's 14 barge loads.
They also have a contract for 11 structures for Aberdeen Bay and it seems that these are 3 legged or tripod bases.
The first of these tripods is under construction now and is being anchored into these tubs that have arrived.
Apparently the tubs are "suction bucket foundations" and are a new way of attaching the structures to the sea bed.

Tripod.jpg

Re: Smulders Projects at Wallsend

PostPosted: Sun Aug 13, 2017 9:21 am
by Whickham
Barge UR98 loaded and ready to go 10/08/2017

UR-98.jpg

UR-98-2.jpg

UR-98-3.jpg

and then going later in the day, towed by PEGASUS

Kevin-2.jpg
Photo by Kevin Blair

See other photos of PEGASUS with tow at: viewtopic.php?f=11&t=22857

Re: Smulders Projects at Wallsend

PostPosted: Sun Aug 13, 2017 9:25 am
by Whickham
Barge UR97 loaded but moved across to A&P at Hebburn waiting her turn to go.
The stern of SIR DAVID ATTENBOROUGH under construction on the quayside.

UR-97.jpg

Re: Smulders Projects at Wallsend

PostPosted: Sun Aug 13, 2017 9:27 am
by Whickham
Barge UR902 alongside at Howdon waiting for her turn to move up to Smulders.

UR-902.jpg

UR-902-2.jpg

Re: Smulders Projects at Wallsend

PostPosted: Mon Aug 14, 2017 7:59 am
by Whickham
A set of quad-legs under construction at Smulders 10/08/2017

Legs.jpg

Re: Smulders Projects at Wallsend

PostPosted: Tue Aug 15, 2017 12:27 pm
by Whickham
Barge UR97 towed by KAMARINA leaves 14/08/2017.

Barge.jpg
Photo by Kevin Blair

Barge-2.jpg
Photo by Kevin Blair

Barge-3.jpg
Photo by Kevin Blair

See details of KAMARINA at: viewtopic.php?f=11&t=22893&p=50096#p50096

Re: Smulders Projects at Wallsend

PostPosted: Tue Aug 15, 2017 3:09 pm
by creemaster
Peterhead has been selected by Boskalis to base their dredging units for the Aberdeen wind farm while the operators of the wind farm have leased office and shed space within Aberdeen Harbour for the 'lifetime of the project'
Graham