Page 1 of 1

Alex Dock redevelopment

PostPosted: Wed Aug 12, 2015 6:34 pm
by northeast
Work proceeds inside and outside Alex with a variety of support craft.

Infilling of the NW arm under way
AlexNorthBay120815A.jpg
12/08/2015

AlexNorthWallInfill120815.jpg
12/08/2015


Split hopper MC.37 of Hamburg IMO8523175
MC37hopper120815.jpg
MC.37


SW BELT of Strabag Wasserbau, 09/135gt ex INGE J ex NEPTUN 8, long shot from the car park
SWBELT120815B.jpg
SW BELT